I. Introduction
Project Name: Levia
Objective: Develop a way of continually generating enough arcane energy to launch Seraphim off the ground.
Agency: The Divine Council - Justice of Arcane Innovation
Duration: 5 years of steep development, Post development only need to maintain continual flow of supply.
Budget: 1million platinum.
II. Project Team and Structure
Project Manager: Professor Elara Thistlebloom, Director of Transumtation Studies at the HSM&B.
Team Members: Isodole Ravsho - Coordinator to D.C. JAI., Grak Skulcross - Lead student developing new models., Tharino Pontivel - Coordinator with Environmental Development Agency (EDA)
Organizational Structure: Professor Thistlebloom is overseeing the project and results as presented by Grak Skulcross who will be leading project developement. Isodole will coordinate and report progress to the D.C. JAI who will in turn report it to the D.C. Tharino Pontivel will recieve instructions from Mr. Skulcross and will execute them as expeted with the resources from the EDA (funded by the DC JEP).
III. Project Scope
Objectives: The goal of this project is to develop a mechanism to generate arcane energy. Professor Thistlebloom's previous work on generating enhanced transumtation stones with veins of water treated from the plane of fire anchor shows the theory behind this work. This project will amplify the available energy used by divine anchors and could lead to a decrease of need for using the anchors itself.
Regulatory Compliance: This project has approval from the VDJ and by coordinating with Mr. Pontivel will have the continued support of the EDA - DC JEP)
Partnerships: This is in collaboration with the DC, the HSM&B.
IV. Research and Development Plan
There will be two main phases of this project. The first is expanding on Thistlebloom Et.Al's previous work on enhanced transmutation stones to generate a fuel supply that can be changed to power the Seraphim Project. Once the methodology is developed, we will then work with the EDA in scouting a suitable location for the long term project.
The initial design involves using a continual flow of mechanical energy to spin a separate solution of pure water that will then be charged by being swirled around the anchor at 600V. This transfers the arcane essence from the anchor to the water as shown by Thistlebloom. The work done by thistlebloom was on a singular orb, and by rotating the orb around sample of the plane of fire at 600V for 3 days, it was able to generate enhanced properties (increased walking speed, expanded darkvision range, high fortitude). A similar process should be able to be applied to the water spun around the divine anchor.
After the water is purified, then this could hold potential to A) power the city to fly, and B) provide a gateway to further enhancements of mages through continued alchemical studies.
The water powered by the divine anchor shall be reffered to in later passages as "Levia" .
Lots more science project outlines
Important Points: A portal will be made for the delivery of a Research and Development "tax" back to the source of knowledge. This shall be delivered weekly and completion of this portal will be overseen by the VoDJ personally.
Risk Assessment:
Levia
There has been no studies on the effects of continual exposure to Levia or its harmful / beneficial effects. As of now, I would highly recoomend only powering arcane machenry through levia and not attempting to enhance living organisms.
Environmental Effects
The generation of Levia requires a large amount of pure water not only to provide a media for arcane essence transfer, but also to power the machines spinning the transfer solution. The current location chosen is a well-defined glacier in the Seraph Peaks that feeds many significant rivers. The ice results in pure water, and there are no additional leads on any other viable water source. Futher studies should be done to observe and correct any detrimental environmental changes.
Comments