Sleeping Sun Historical Log
Scribe Log:
…
Year: -8156 AG
…
Testing 233 completed – 3 signatures sequestered.
3 signatures released
Testing 234 completed – 10 signatures sequestered.
10 signatures released
Testing 235 completed – 100 signatures sequestered.
100 signatures released
…
Year: -8146 AG
Energy gathered. Priming…
Activating…
Activation complete – 14,723 signatures sequestered
Energy pulse: 3,190 km radius.
Quori presence in radius: 0.
Note: Skybreaker activation successful.
Travel to Dal Quor rendered impossible
All Quori already on Eberron contained.
Arcane engine - stability assured
Celebration will at the Scribe’s Fortress at sunset
Entering long term monitoring
…
Year: -8109 AG
--
Catastrophic defense failure
Air quality warning – neurotoxins present
Temperature warning – critically low
Temperature warning – critically high
Divination sensors dispelled
Conjuration link to The Swift dispelled
…
Year: -8108 AG
--
Missed scheduled maintenance period x358
Missed scheduled security check x358
. . .
Missed scheduled maintenance period x359
Missed scheduled security check x359
. . .
Missed scheduled maintenance period x360
Missed scheduled security check x360
. . .
…
Year: 982 AG
--
Power insufficient – automated dispelling of non-essential enchantments
Planar Laboratory – breach detected, test subjects released
…
Damage detected to Sleeping Sun
Estimated source – rockfall – potential burrowing saboteurs.
Request urgent security inspection.
Request critical repair from Su’Lat Artificers.
Manufactory divination sensors show extreme damage outside liveable range – sending backup repair requests to Scora Bael Embassy.
…
Critical repairs overdue
…
Critical repairs overdue
…
Critical repairs overdue
…
Year: 987 AG
Damage not repaired. Damage to Sun has spread, panels 431 through 433 are now damaged. Priority Repairs required
…
Year: 1001 AG
…
Critical repairs overdue
…
Critical repairs overdue
…
Damage not repaired. Damage to Sun has spread, panels 431 through 438 are now damaged. Priority Repairs required
MAJOR BREACH LIKELY WITHIN 30 days
…
Critical repairs overdue
MAJOR BREACH LIKELY WITHIN 14 days
…
Critical repairs overdue
MAJOR BREACH LIKELY WITHIN 7 days
CRITICAL ALERT: Repairs attempt failed. Damage to Sun has spread, panels 431 through 445 are now damaged.
VIOLET ALERT. CRITICAL BREACH.
Sequester Cells Breached – quori signature lost
...gathering energy
…gathering energy
Warning: time to quarantine exceeded safe levels
…gathering energy
…gathering energy
…gathering energy
Beginning emergency quarantine
Awakening all constructs
Emergency seals activated – chamber access barred
Sequester pulse enabled for recapture and quarantine
Recapture and Quarantine completed – 955 signatures sequestered.
1 quori unaccounted – urgent security request.
Quarantine in place until repairs are concluded
…
…
Critical repairs overdue
Damage not repaired. Damage to Sun has spread, panels 431 through 452 are damaged. Priority Repairs required
MINOR BREACH – POSSIBILITY OF ESCAPE. CHAMBER REMAINS SEALED.
COMPLETE BREACH LIKELY WITHIN 600 days
Year: 1002 AG
…
Damage not repaired. Damage to Sun has spread, panels 431 through 456 are damaged. Priority Repairs required
Sequester Cell Breached – signature lost
COMPLETE BREACH LIKELY WITHIN 400 days
…
Damage not repaired. Damage to Sun has spread, panels 431 through 460 are damaged. Priority Repairs required
Sequester Cell Breached – signature lost
Sequester Cell Breached – signature lost
COMPLETE BREACH LIKELY WITHIN 200 days
…
Damage not repaired. Damage to Sun has spread, panels 431 through 471 are damaged. Priority Repairs required
Sequester Cell Breached – signature lost
Sequester Cell Breached – signature lost
Sequester Cell Breached – signature lost
COMPLETE BREACH LIKELY WITHIN 90 days
Type
Record, Historical
Comments